Resurfacing project for Highway 323 tentatively scheduled for 2022

Proposed project separate from 54 mile stretch scheduled for 2021 construction season

 

October 9, 2020

The Montana Department of Transportation (MDT) recently announced a proposal to resurface about 9.5 miles of Highway 323, southeast of Ekalaka. The public is invited to comment.

The project begins approximately one mile south of the Prairiedale Road intersection, at reference post 8.2 and extends southeast for 9.5 miles ending near the Boxelder Creek Bridge at reference post 17.7.

Proposed work includes pulverization, grading and paving the roadway, and finishing with a seal and cover (chip seal). Bridge work, upgraded pavement marking and signage are also included. The purpose of the proj...



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024

Rendered 04/22/2024 05:37