Your Community Builder
The Montana Department of Transportation recently announced a proposal to seal and cover about 53.7 miles of MT Highway 323, north of Alzada. The project begins at the Box Elder Creek Bridge at reference post 17.7 and extends south for 53.7 miles ending at the intersection with U.S. Highway 212 in Alzada, at reference post 71.0. The public is invited to comment on the project.
Proposed work includes sealing existing cracks, installing edge drains at select locations to drain saturated roadbed segments and finishing with a seal and cover (chip seal) and upgraded pavement markings. The purpose o...
Reader Comments(0)